Pre-Construction. To be built. Brand new builder owned 3/2 spec home with estimated completion date of October 2024. CBS construction with fullbuilder warranties. Terrific plan featuring large great room, den, gourmet kitchen appliances, extensive ceramic tile flooring, lanaiand much, much more.
O6081500
Residential - Single Family, Contemporary, 1 Story
3
2 Full
2024
Polk
0.26
Acres
Public
1
Block,Stucco
Public Sewer
Loading...
The scores below measure the walkability of the address, access to public transit of the area and the convenience of using a bike on a scale of 1-100
Walk Score
Transit Score
Bike Score
Loading...
Loading...